Membrane Treatment Plant Schedule Oversight
A 40 MGD membrane plant under progressive design-build, where the owner needs an independent schedule read at every price phase.
- Owner
- Confidential
- Region
- U.S. Gulf Coast
- Market
- Water & Wastewater
- Our role
- Owner's schedule oversight
- Size
- 40 MGD
- Delivery
- Progressive Design-Build
- Duration
- 44 months
- Status
- In progress · 2027
What is at stake.
Under progressive design-build, the schedule and price are set in stages. The utility has to accept each phase without its own scheduling staff, and the design-builder's schedule is the only one at the table.
What we are doing.
Beck Franklin's role: owner's schedule oversight. We advise and measure; the contractor builds.
Independent review
We review every schedule submission for logic, durations and constraints before the owner accepts it.
Membrane procurement
Membrane skid procurement and factory testing are tracked as their own path, because they drive start-up.
Phase gate input
At each price phase, we give the owner a written view on whether the proposed schedule is achievable.
Risk register link
Schedule risks are tied to the project risk register, so contingency discussions use the same data.
Where it stands.
Progressive design-build works when the owner can test what it is being asked to accept. That is the role we play.
Owner's scheduler, Beck Franklin
Illustrative imageMore from Infrastructure.
All Infrastructure
Water & Wastewater · 2025Raw Water Pipeline and Pump Station BaselineU.S. Southwest · Baseline development · 32 months
Water & Wastewater · 2024Biosolids Digester Upgrade RecoveryU.S. Mid-Atlantic · Schedule recovery · 26 months
Transportation · In progressTransit Station Accessibility ProgramU.S. Northeast · Integrated master schedule · 40 months
Facing something like this?
Send us the schedule and the date that matters. We will tell you what is driving it and where you can still act. Repeat or similar projects qualify for our discounted Program Rate.