Advanced Industry · Life Sciences

Validated is the finish line.

A manufacturing suite is not done when construction is. Commissioning, qualification and validation decide when product can be made, and Beck Franklin keeps that path in the schedule from day one.

Life Sciences

Where life sciences dates slide.

What goes wrong with time and cost in this market, usually long before anyone reports it.

01

CQV is planned last

Commissioning, qualification and validation are often added late with short durations. They are where the start of production is really set.

02

Process equipment owns the path

Bioreactors, isolators and skids arrive on fabrication schedules with factory and site acceptance testing in between.

03

Design keeps changing

Process changes during construction are common. Without time impact checks, the schedule absorbs them silently until it cannot.

Drivers and milestones at risk

What we watch every update.

  1. 01

    Equipment FAT and SAT

    Factory acceptance, shipping, setting and site acceptance tests tied to the rooms and systems each piece of equipment serves.

  2. 02

    Clean utilities

    Purified water, clean steam and HVAC systems tracked to qualification, since every suite depends on them.

  3. 03

    CQV sequence

    Installation, operational and performance qualification given real durations and logic, protected from late compression.

  4. 04

    The milestones at risk

    Mechanical completion, system turnover, qualification complete and start of production, each with remaining float.

The services that fit here.

The 4 services owners and contractors in life sciences use most.

Baseline Schedule ReviewPlan

We test whether the baseline carries CQV, equipment testing and clean utilities as real logic before you accept it.

Critical Path AnalysisControl

A regular read of what is driving the start of production, including the equipment and qualification paths.

Time Impact AnalysisRecover

Each process or design change time impacted, so the effect on qualification and production dates is known before approval.

Cost Forecasting & ControlControl

Forecasts that track change, equipment and contingency by area, so the final cost is visible well before closeout.

Straight answers to fair questions.

Do you schedule commissioning and qualification?

Yes. We carry CQV in the same network as construction, so turnover packages and qualification dates are tied to the work that feeds them.

Can you work with our validation team?

Yes. We build the schedule logic with them, so their sequence and durations are reflected rather than assumed.

Is there a better rate for repeat suites or sites?

Yes. Similar suites and sites fit a highly discounted Program Rate because the logic and templates are already in place.

Life Sciences

Show us the milestone you are protecting.

Send the life sciences schedule and the date everyone is watching. Beck Franklin will tell you what is driving it and where you still have options.