Project controls · Construction scheduling · Project management consulting Know what’s driving your project CareersPartnersMediaProgram RatesData date
Our story · Three questions

Built on three hard questions.

For more than a decade, Emmanuel Ugbaja kept meeting the same three questions on complex construction and infrastructure projects. The answers usually arrived too late. Beck Franklin exists to bring them early.

In project controls
10+ yrs
Questions behind the firm
3
Services today
16
The story

The questions that built the firm.

Each one showed up on real projects, with real commitments on the line. Together they explain how we work.

Question one
The baseline

Can the work be built this way?

On project after project, the baseline was accepted because it looked complete. Durations came from the bid, sequences ignored how the trades would share the floor, and the first update quietly started to drift.

  • Baseline realism
  • Logic and durations
  • Primavera P6
Question two
The delay

Confined, or will it move a milestone?

Every delay got the same alarm, or the same shrug. The real question was whether float would absorb it in one work area or it would reach a contractual milestone. Few reports answered it.

  • Critical path analysis
  • Float
  • Contractual milestones
Question three
The action

What can the team change now?

By the time a slip was proven, the cheap options were gone. Resequencing, added shifts and early procurement all work best in the month before anyone wants to admit the date is at risk.

  • Schedule recovery
  • Resequencing
  • Decision window
The pattern
What kept happening

Updated every month, read too late

The schedules were updated. The reports were filed. What was missing was someone comparing the file with the field and saying plainly where to act while there was still time to act.

  • Progress reporting
  • Field verification
  • Plain answers
Beck Franklin
Why the firm exists

That judgment, on every review

Emmanuel Ugbaja built Beck Franklin to answer those three questions early, for owners, contractors and project teams on commercial, industrial and infrastructure work.

  • Owners
  • Contractors
  • Project teams
Today
How it shows up

Sixteen services and an open lab

16 services across planning, control, recovery and advice. A Controls Lab with 7 live tools. Program Rates for repeat work, because the setup is already built.

  • Controls Lab
  • Program Rates
  • 16 services
The thread through all of it

Same questions. Earlier answers.

A late answer and an early answer can say exactly the same thing. Only one of them still leaves you a choice. Everything we do is aimed at the early one.

3
Questions
16
Services
7
Lab tools
What does not change
Field before file.

A finding starts with what is installed on site. A tidy schedule that disagrees with the field is still wrong.

Say where to act.

Every report names the driver, the milestone at risk and the move the team can make this period.

Early over comfortable.

If the news is bad, you hear it while you still have options, not after they are gone.

Discuss your project

Ask the three questions on your project.

Send us the schedule and the milestone that matters. We will tell you what is driving it and what can still change.