Plan · Baseline Schedule Review

Test the baseline before you accept it.

An independent review of the contractor’s baseline before approval. We test logic, float, calendars, constraints and the driving path, then tell you in writing what to accept, what to reject and why.

An accepted baseline becomes the yardstick.

01

Approval turns into evidence

Once accepted, the baseline measures every delay and time extension request. Flaws you approve are flaws you later defend.

02

Float banked in plain sight

Preferential logic and padded durations can hold float for one party. It surfaces months later inside a claim.

03

A short review window

Many contracts give the owner a few weeks to respond. Without a scheduler on your side, the clock runs out and silence reads as acceptance.

What Beck Franklin does

How we review a baseline.

  1. 01

    Work from the native XER

    Logic, codes, calendars and constraints only show in the P6 data. A PDF hides most of what matters.

  2. 02

    Count the health metrics

    Missing ties, leads, lags, start-to-finish links, hard constraints, high float, negative float and long durations, listed by activity.

  3. 03

    Hold it against the contract

    Milestones, access dates, phasing, work windows and the scheduling specification compared with what the file actually shows.

  4. 04

    Trace each driving path

    We follow the path to every milestone and confirm it runs through real work rather than a constraint or a lag.

  5. 05

    Draft the comments you send

    Numbered review comments in contract language with a recommended disposition, ready to issue.

What you walk away with.

Scoped to your project. Native files and plain-English outputs that stay yours when we leave.

Review reportFindings

Issues ranked by consequence, with the specific activities, ties and constraints behind each one.

Comment logReady to issue

Numbered comments with a recommendation: approve, approve as noted, or revise and resubmit.

Specification checkContract

Each scheduling requirement in the specification marked met or not met, with the evidence.

Milestone path summaryFloat in days

The driving path to each contract milestone described in plain words, with total float stated.

Resubmittal reviewFollow-up

A second pass on the revised file to confirm every comment was actually closed.

Timing

When to call us.

The earlier we see the schedule, the more options you keep.

01

The baseline just arrived

The review window has started. Call on day one, not on the last day.

02

The resubmittal looks familiar

The contractor revised the file, and the same problems seem to be back.

03

Your team is light on P6

Your project managers are strong, but nobody on staff reads XER logic every week.

04

It was accepted without review

We can still document what the baseline contains before the first time extension request arrives.

Straight answers to fair questions.

Can you review from a PDF?

We can comment on one, but the useful findings live in the native file. Most specifications require the XER, so ask for it.

Will a detailed review damage the relationship?

Rarely. Specific, early comments cost far less goodwill than a dispute a year later.

Do contractors hire you for this too?

Yes. Contractors ask us to check their baseline before it goes to the owner, so fewer comments come back.

How fast is the turnaround?

We scope the review to fit your contract response period and confirm the turnaround before we start.

Related services.

Baseline Schedule Review

Send the schedule. Act while you have options.

Share the project, the latest XER and the date you are protecting. We will tell you plainly what the schedule is telling you.