Highway Widening Owner Schedule Review
Eighteen miles of highway widening and twenty-two bridges, with a design-builder's schedule reviewed for the agency every month.
- Owner
- Confidential
- Region
- U.S. Gulf Coast
- Market
- Transportation
- Our role
- Owner's schedule review
- Size
- 18 miles · 22 bridges
- Delivery
- Design-Build
- Duration
- 54 months
- Status
- In progress · 2027
What is at stake.
The agency's own staff did not have time to test each update. Traffic switches, utility relocations and bridge demolition windows all depend on approvals outside the contractor's control.
What we are doing.
Beck Franklin's role: owner's schedule review. We advise and measure; the contractor builds.
Update review
Each monthly update is checked for logic changes, constraints, out-of-sequence progress and lost float.
Utility relocation path
Utility relocations are tracked as their own path, because they drive several bridge starts.
Traffic switch plan
Every traffic switch is scheduled with its permits and lane closure windows.
Agency memo
The agency receives a review memo with accept, accept with comment or reject, and the reasons.
Where it stands.
The agency signs off on each update. We make sure it knows what it is signing.
Owner's scheduler, Beck Franklin
Illustrative imageMore from Infrastructure.
All Infrastructure
Transportation · In progressTransit Station Accessibility ProgramU.S. Northeast · Integrated master schedule · 40 months
Transportation · 2024Freight Rail Yard Expansion Delay AnalysisU.S. Midwest · Windows delay analysis · 28 months
Water & Wastewater · In progressMembrane Treatment Plant Schedule OversightU.S. Gulf Coast · Owner's schedule oversight · 44 months
Facing something like this?
Send us the schedule and the date that matters. We will tell you what is driving it and where you can still act. Repeat or similar projects qualify for our discounted Program Rate.