Plan · Primavera P6 Scheduling

P6 files your team can trust.

Primavera P6 scheduling done properly: activity codes, calendars, scheduling options, resource and cost loading, layouts and baseline control. A clean database means every report you pull tells the same story.

Messy P6 data hides the driver.

01

Calendars nobody checked

A five-day calendar on a weekend crew, or holidays left out. Dates shift and nobody can explain why.

02

Codes that do not roll up

Area, phase and responsibility codes applied unevenly, so filters miss activities and reports undercount the work.

03

Options left on default

Retained logic or progress override, longest path or total float. The wrong setting changes the critical path and nobody notices.

What Beck Franklin does

How we set up P6.

  1. 01

    Settings chosen on purpose

    Scheduling options, calendar rules and the float calculation set deliberately and written into the basis of schedule.

  2. 02

    Codes that answer questions

    Activity codes for area, phase, trade, responsibility and contract, so any view leadership asks for is one filter away.

  3. 03

    Loading where it pays

    Labor, equipment and cost loaded where it earns its keep, so histograms, curves and earned value come straight from the schedule.

  4. 04

    Layouts people open

    Saved layouts for look-aheads, critical and near-critical work, milestones and responsibility, shared across the team.

  5. 05

    Baselines kept straight

    Baseline and update copies named, stored and assigned correctly, so variance always compares against the right version.

What you walk away with.

Scoped to your project. Native files and plain-English outputs that stay yours when we leave.

Configured P6 projectXER

Codes, calendars, settings and layouts built to your standard and ready for the people who will use it.

Scheduling standardGuide

A short written standard for naming, coding, calendars and updates that every scheduler on the job follows.

Layout and filter setViews

Look-ahead, critical, near-critical, milestone and responsibility views, exported for reuse on the next project.

Pre-issue data checkEach update

A recurring check for open ends, out-of-sequence progress and code gaps before any update leaves the building.

Project templateReusable

WBS, codes and logic fragments packaged as a starting point for the next similar project.

Timing

When to call us.

The earlier we see the schedule, the more options you keep.

01

A new P6 project is starting

Set the structure right on day one rather than rebuilding it at month six.

02

Your schedules do not agree

Each project codes differently, so a portfolio view is impossible.

03

The scheduler moved on

The file still updates, but nobody fully knows why it behaves the way it does.

04

New reporting requirements landed

The owner changed coding or submittal rules mid-job, and the live schedule has to absorb them cleanly.

Straight answers to fair questions.

Can you work inside our P6 database?

Yes. We work in your environment or deliver XER files for import, depending on your access rules.

Do you convert Microsoft Project schedules to P6?

Yes, and we rebuild the logic and calendars that do not translate cleanly. A straight import rarely holds.

Retained logic or progress override?

Usually retained logic, because it respects the network. We state the choice in writing and show what it changes.

Can you train our people?

Yes. We run working sessions on your own project file, not on generic training data.