Brewery Packaging Hall Delay Analysis

A packaging hall expansion where a late filler and a floor drain redesign both claim the same delay.

Owner
Confidential
Region
U.S. Southeast
Market
Food & Beverage
Our role
Time impact analysis
Size
2 packaging lines
Delivery
Design-Build
Duration
20 months
Status
In progress · 2026
The challenge

What is at stake.

The filler arrived late from the vendor. In the same period, the floor drain system was redesigned after a code review. The contractor seeks time for both; the owner believes one caused most of the delay.

Schedule20 monthsIn progress · finish 2026
20252026
Today
Start
2025
Planned finish
2026
Time elapsed
94%
Our role

What we are doing.

Beck Franklin's role: time impact analysis. We advise and measure; the contractor builds.

01

Update baseline

We are using the contractor's accepted updates as the base, so the analysis reflects what was known at the time.

02

Prospective TIA

Each event is modeled as a fragnet and inserted in the update before it occurred.

03

Concurrency

Where the two events overlap, the analysis separates their effect on the driving path.

04

Clear recommendation

The owner will receive a short report with a recommended extension and the reasoning behind it.

Results

Where it stands.

2Delay events analyzed
4Updates used as the basis
In progressFindings due before closeout
20Months, contract to start-up

Two events, one delay. The analysis shows how much of the finish each one actually moved.

Forensic scheduler, Beck Franklin