Brewery Packaging Hall Delay Analysis
A packaging hall expansion where a late filler and a floor drain redesign both claim the same delay.
- Owner
- Confidential
- Region
- U.S. Southeast
- Market
- Food & Beverage
- Our role
- Time impact analysis
- Size
- 2 packaging lines
- Delivery
- Design-Build
- Duration
- 20 months
- Status
- In progress · 2026
What is at stake.
The filler arrived late from the vendor. In the same period, the floor drain system was redesigned after a code review. The contractor seeks time for both; the owner believes one caused most of the delay.
What we are doing.
Beck Franklin's role: time impact analysis. We advise and measure; the contractor builds.
Update baseline
We are using the contractor's accepted updates as the base, so the analysis reflects what was known at the time.
Prospective TIA
Each event is modeled as a fragnet and inserted in the update before it occurred.
Concurrency
Where the two events overlap, the analysis separates their effect on the driving path.
Clear recommendation
The owner will receive a short report with a recommended extension and the reasoning behind it.
Where it stands.
Two events, one delay. The analysis shows how much of the finish each one actually moved.
Forensic scheduler, Beck Franklin
Illustrative imageMore from Advanced Industry.
All Advanced Industry
Food & Beverage · 2024Plant-Based Protein Facility Schedule ReviewU.S. Midwest · Schedule review and updates · 22 months
Food & Beverage · 2023Dairy Process Line Expansion Cost ControlsU.S. Upper Midwest · Cost forecasting and change control · 18 months
Manufacturing · In progressBattery Module Assembly Plant BaselineU.S. Southeast · Baseline development and P6 · 30 months
Facing something like this?
Send us the schedule and the date that matters. We will tell you what is driving it and where you can still act. Repeat or similar projects qualify for our discounted Program Rate.